Site allocations development plan

Our site allocations document forms part of the Local Development Framework for Camden and will set out some guidelines for future development on significant sites which have been or are likely to be subject to development proposals. It applies to sites across the borough.

Camden Site Allocations Plan - Adoption Statement

On 9 September 2013 Camden's Full Council resolved to adopt the Site Allocations Plan. A copy of the Adoption Statement can be downloaded below:

Inspector's report

On 24 June 2013 we received the Inspector’s Report into Camden’s Site Allocation Local Plan (SALP):

The report concluded that the SALP was ‘sound’. 

Proposed modifications consultation

A number of representations were received as part of the consultation on the proposed modifications:

Proposed modifications

As a result of the examination process, further changes (known as Main Modifications) to the Site Allocations document were proposed:

A number of Minor Modifications were also proposed. These comprise factual updates, points of clarification and other minor changes which individually were not considered to materially affect the soundness of the Plan:

We have also reviewed the Sustainability Appraisal in light of the Main Modifications and this is published alongside a 'Tracked Changes' version of the Plan. These documents can downloaded here:

Examination

An Inspector, Louise Crosby MA MRTPI, was appointed by the Secretary of State to conduct an examination to determine whether the Site Allocations document was sound:

Site allocations development plan examination

Site allocations: submission document

The Camden Site Allocations Plan was submitted to the Secretary of State for independent examination following three stages of consultation and final stage of representations from March to May 2012:

Previous stages in the preparation of the site allocations

Proposed submission site allocations

From March 2012 to May 2012 we carried out consultation on the Proposed Submission Site Allocations document:

Further sites consultation

From November 2010 to January 2011, we carried out consultation on the inclusion of a number of additional sites in our Site Allocations document. This followed on from the Preferred approach consultation carried out between November 2009 and January 2010 and the Issues and options consultation that was carried out in 2008:

Preferred approach consultation (November 2009 to January 2010)

The Preferred Approach consultation was the second main consultation stage in preparing the Site Allocations DPD. It followed on from our Issues and Options consultation in 2008 and sets out a suggested approach to the future development of the boroughs major sites:

Issues and Options Consultation (October to November 2008)

The issues and options consultation was the first main consultation stage in preparing the Site Allocations DPD.

It sought views on potential development sites within the borough. This consultation was used to assist development of our preferred approach:

Sites suggested for future development (February 2008)

During February and March 2008 we invited landowners, developers, agents and other interested parties to suggest sites for potential development or redevelopment that they may want included within this document.

We received a number of responses relating to various sites of which most have been included for consideration through the Site Allocations consultation document.

Sustainability appraisal

The progression of the Site Allocations document was carried out in conjunction with a Sustainability Appraisal which ensured that planning documents were informed by sustainability principles at an early stage in the process:

Would you like to provide feedback?(Click to show feedback form)

Please rate this page to help us improve camden.gov.uk. Please don't include your contact details as we are unable to provide responses via this form. To get in touch please click here.

Please select one of the options.

Thank you for your feedback.